- Home
- ARC Party Wall DPC Horizontal
ARC Party Wall DPC Horizontal
One push-fit strip that blocks fire, smoke and moisture at every separating floor
ARC Party-Wall DPC Horizontal socks slide into the external-wall cavity at the floor edge of a party wall, expanding to create a complete fire, acoustic, thermal and damp break. The core is Euroclass A1 rock-fibre wrapped in a polyethylene DPC sleeve, delivering:
Up to 4 hours fire integrity and 15 minutes insulation (EN 1366-4, IFCC 1728)
A continuous DPC that stops capillary moisture and satisfies Approved Doc C
λ 0.037 W/m·K conductivity—helps designers hit the zero U-value party-wall target
Flanking-sound damping to boost Part E results
Order before 12:00 and spend £200 ex-VAT for free next-working-day delivery. Need a take-off? Call our technical desk on 0118 922 7941.
Size selector – pick your sock & add to basket
Clear cavity | 650 mm DPC sleeve | 700 mm DPC sleeve | Pack qty |
---|---|---|---|
55 mm | PW50H | — | 12 |
80 mm | PW75H | — | 8 |
90-105 mm | PW85H / PW100H | — | 6 |
125-155 mm | — | PW125H / PW150H / PW140H | 4–6 |
175-255 mm | — | PW175H / PW200H / PW250H | 2–3 |
Need a vertical sock instead? See ARC Party-Wall DPC Cavity Socks.
External edge seal? Step up to an ARC T-Barrier Masonry.
Why you need a horizontal barrier at floor level
Fire strategy: Approved Document B demands cavity barriers at the junction of a compartment floor and an external wall. The PW-DPC-H range fulfils that in one piece.
Moisture control: The built-in DPC folds under the screed or timber deck, blocking rising or penetrating damp from the outer leaf.
Thermal bridge: Closing the air-path and adding mineral-wool insulation keeps Psi-values low for SAP calculations.
Speed on site: Push-fit installation—no mechanical fixings, no separate DPC roll, no call-backs. Speechunter
How to install (3 quick steps)
Trim to length so butt-joints land tight against joists or concrete slabs.
Compress & fit—push the sock into the cavity until the red DPC sleeve sits flush with the party-wall face.
Seal joints—tight butt joints are usually enough; fill gaps > 5 mm with mineral-wool off-cuts or intumescent acrylic.
Pair with Fire Socks & Barriers for spandrels, soffits and window heads.
Compliance snapshot
Regulation | PW-DPC Horizontal performance |
---|---|
Part B / BS 9991 | 4 h fire integrity, 2 h insulation (IFCC 1728) |
Part C | Integral polyethylene DPC breaks capillary paths |
Part E | Rock-fibre core reduces flanking sound by ≥ 5 dB |
Part L (SAP) | λ 0.037 W/m·K supports zero-U party-wall detail |
Frequently asked questions
Do I need mechanical fixings?
No—the socks are friction-fit provided the cavity width is within ± 5 mm of the product size.
Can these be used in timber-frame construction?
For timber-to-timber junctions switch to ARC TCB Timber Cavity Barriers, which are sized and tested for stud walls.
How many lengths per storey?
Run a continuous strip the full width of the elevation at every separating floor; typically one 1.2 m length per linear metre of wall.
Is next-day delivery guaranteed?
Order before noon, spend £200 ex-VAT and check our delivery information for postcode exceptions.
Still chasing the spec?
Email drawings to Contact Us or ring 0118 922 7941—our 35-year envelope team will size, schedule and quote the same day.
Spechunter.co.uk – Chasing down specialist construction specifications since 1988. Fact checked & updated May 2025