ARC Party Wall DPC L-Shape

Close two critical gaps with one push-fit product

When a separating (party) wall hits the external leaf you need to stop fire, smoke, cold bridging and moisture at the junction — in both directions. ARC Party-Wall DPC L-Shape socks make the detail effortless:

  • Euroclass A1 mineral-wool core expands to fill both the vertical party cavity and a 250 mm horizontal return across the outer leaf.

  • Integral polyethylene DPC sleeve wraps the internal face, blocking capillary moisture and satisfying Approved Document C.

  • Tested to EN 1366-4 and third-party approved (IFCC 1728) for up to 4 hours fire integrity / 2 hours insulation at the wall edge.

  • Thermal conductivity λ 0 .037 W/m·K helps designers achieve the zero-U party-wall junction in SAP.

Need a take-off or bespoke width? Call the Spechunter technical desk on 0118 922 7941 — we’ll size and schedule the same day.


Choose the right L-shape in seconds

Clear cavity (mm)Product link*Dimensions (mm) <br>(Cavity × Return)Pack
55PW50 L55 × 2508
80PW75 L80 × 2508
90PW85 L90 × 2506
95PW90 L95 × 2506
105PW100 L105 × 2504
120-155PW115 L / PW125 L / PW140 L / PW150 L120-155 × 2504
>155–300PW175 L / PW200 L / PW300 L175-305 × 3502-4

*Links jump straight to the individual bagged sizes on Spechunter.

Need straight or horizontal socks? Switch to ARC Party-Wall DPC Cavity Socks or PW-DPC Horizontal.
Edge seal on the external side? See ARC T-Barrier Masonry.


Installation – three quick steps

  1. Measure & cut – trim the 1.2 m lengths so the vertical leg reaches slab-to-slab; keep the horizontal return flush with the outer-leaf face.

  2. Compress & insert – squeeze the mineral wool and push the L into the corner until both faces sit tight.

  3. Seal joints – butt successive pieces firmly; fill gaps > 5 mm with mineral-wool off-cuts or intumescent acrylic.

No mechanical fixings, ties or separate DPC required.


Compliance snapshot

RequirementPW-DPC L-Shape performance
Fire (ADB / BS 9991)≤ 4 h integrity, ≤ 2 h insulation at junction
Moisture (Part C)Integral DPC sleeve across both faces
Thermal (SAP / Part L)λ 0.037 W/m·K; supports zero-U detail
Acoustics (Part E)Rock-fibre core reduces flanking sound ≥ 5 dB
Third-partyIFC Certificate IFCC 1728 – audited production

Frequently asked questions

Why use an L-shape instead of separate vertical & horizontal socks?
One piece guarantees continuity of fire and DPC layers, plus it’s faster to install and eliminates a potential cold bridge at the corner.

Can I bend the horizontal leg up or down?
Only very slightly. For steep steps specify ARC Spandrel Barriers or cut & butt two pieces with intumescent mastic.

Do I need ties through the barrier?
No – the sock is friction-fit. Keep the cavity within ±5 mm of the product size.

Is next-day delivery available?
Yes—order before noon, spend £200 ex-VAT and check our delivery information for remote-area surcharges.


Complete your party-wall package


Order today and chase down every last spec with Spechunter’s 35-year envelope know-how. Questions? Contact us or ring 0118 922 7941.

Spechunter.co.uk – Chasing down specialist construction specifications since 1988. Fact checked & updated May 2025.

...
Showing 1 - 9 of 13 items