- Home
- ARC Party Wall DPC L-Shape
ARC Party Wall DPC L-Shape
Close two critical gaps with one push-fit product
When a separating (party) wall hits the external leaf you need to stop fire, smoke, cold bridging and moisture at the junction — in both directions. ARC Party-Wall DPC L-Shape socks make the detail effortless:
Euroclass A1 mineral-wool core expands to fill both the vertical party cavity and a 250 mm horizontal return across the outer leaf.
Integral polyethylene DPC sleeve wraps the internal face, blocking capillary moisture and satisfying Approved Document C.
Tested to EN 1366-4 and third-party approved (IFCC 1728) for up to 4 hours fire integrity / 2 hours insulation at the wall edge.
Thermal conductivity λ 0 .037 W/m·K helps designers achieve the zero-U party-wall junction in SAP.
Need a take-off or bespoke width? Call the Spechunter technical desk on 0118 922 7941 — we’ll size and schedule the same day.
Choose the right L-shape in seconds
Clear cavity (mm) | Product link* | Dimensions (mm) <br>(Cavity × Return) | Pack |
---|---|---|---|
55 | PW50 L | 55 × 250 | 8 |
80 | PW75 L | 80 × 250 | 8 |
90 | PW85 L | 90 × 250 | 6 |
95 | PW90 L | 95 × 250 | 6 |
105 | PW100 L | 105 × 250 | 4 |
120-155 | PW115 L / PW125 L / PW140 L / PW150 L | 120-155 × 250 | 4 |
>155–300 | PW175 L / PW200 L / PW300 L | 175-305 × 350 | 2-4 |
*Links jump straight to the individual bagged sizes on Spechunter.
Need straight or horizontal socks? Switch to ARC Party-Wall DPC Cavity Socks or PW-DPC Horizontal.
Edge seal on the external side? See ARC T-Barrier Masonry.
Installation – three quick steps
Measure & cut – trim the 1.2 m lengths so the vertical leg reaches slab-to-slab; keep the horizontal return flush with the outer-leaf face.
Compress & insert – squeeze the mineral wool and push the L into the corner until both faces sit tight.
Seal joints – butt successive pieces firmly; fill gaps > 5 mm with mineral-wool off-cuts or intumescent acrylic.
No mechanical fixings, ties or separate DPC required.
Compliance snapshot
Requirement | PW-DPC L-Shape performance |
---|---|
Fire (ADB / BS 9991) | ≤ 4 h integrity, ≤ 2 h insulation at junction |
Moisture (Part C) | Integral DPC sleeve across both faces |
Thermal (SAP / Part L) | λ 0.037 W/m·K; supports zero-U detail |
Acoustics (Part E) | Rock-fibre core reduces flanking sound ≥ 5 dB |
Third-party | IFC Certificate IFCC 1728 – audited production |
Frequently asked questions
Why use an L-shape instead of separate vertical & horizontal socks?
One piece guarantees continuity of fire and DPC layers, plus it’s faster to install and eliminates a potential cold bridge at the corner.
Can I bend the horizontal leg up or down?
Only very slightly. For steep steps specify ARC Spandrel Barriers or cut & butt two pieces with intumescent mastic.
Do I need ties through the barrier?
No – the sock is friction-fit. Keep the cavity within ±5 mm of the product size.
Is next-day delivery available?
Yes—order before noon, spend £200 ex-VAT and check our delivery information for remote-area surcharges.
Complete your party-wall package
Vertical runs – PW-DPC Cavity Socks
Horizontal floor edges – PW-DPC Horizontal
External edge seal – T-Barrier Masonry
Spandrel or roof abutments – ARC Spandrel Barriers
Order today and chase down every last spec with Spechunter’s 35-year envelope know-how. Questions? Contact us or ring 0118 922 7941.
Spechunter.co.uk – Chasing down specialist construction specifications since 1988. Fact checked & updated May 2025.
...