Fire Socks & Barriers

When a cavity turns into a chimney, you need more than good intentions—you need certified fire-stopping that fits first time. Our ARC Building Solutions range covers every junction: horizontal runs, vertical party walls, service penetrations and roof interfaces. All products are Euroclass A1 or B-s1,d0 and tested to BS EN 1366-4, so they pass Building Control without a wobble.

Order before 12:00, spend £200 ex-VAT and we’ll deliver free next working day.
Unsure which barrier matches your build? Call 0118 922 7941—we’ll size it while your brickies set out.


Quick-order guide

Cavity width / detailBarrier typeLengthPack qtyQuick-add*
50 – 150 mm straight runsARC Cavity Stop Socks1200 mm15–40Browse
80 – 300 mm party wallsARC Party-Wall Socks1200 mm6–12Browse
Party-wall DPC + fire stopARC PW DPC Socks (vertical, horizontal & L-shape)1200 mm2–12Browse
Timber-frame to masonryARC TCB-TT Timber-to-Timber / Timber-to-Brick1200 mm12–24Browse
Masonry to masonryARC TCB Flanged Barriers1200 mm12–40Browse
Roof & gable interfacesARC T-Barrier Masonry1200 mm3–6Browse
Spandrel panels & dormersARC Spandrel Barrier1200 mm12Browse

Why contractors trust ARC fire socks

  • Euroclass A1 mineral wool—zero-fuel core with 30 or 60-minute fire integrity.

  • Integrated DPC sleeves on party-wall socks stop moisture tracking.

  • Pre-cut to cavity size—compression fit, no crafting on scaffold boards.

  • Polythene weather sleeve keeps cores dry until the wall is closed.

  • NHBC & LABC accepted—documentation ready for your QA file.


Five-step installation checklist

  1. Check cavity width—socks must compress 5–10 mm for an airtight seal.

  2. Keep the sleeve intact until the barrier is in place; tear along the score to expose flanges.

  3. Staple or nail flanges to studs or inner leaf at 300 mm centres.

  4. Butt joints tightly; never leave gaps—cut a small off-cut if needed.

  5. Link to DPC & trays—run the polythene sleeve under the damp-proof course or use Visqueen High-Bond DPC for self-adhesive upstands.

Complete vertical runs with Invisiweep A1 weep holes to maintain cavity drainage.


Frequently asked questions

Do I still need cavity closers at window reveals?
Yes—pair socks with ARC Eco-Closer Plus for thermal and fire performance.

Can socks bridge across movement joints?
No—stop 10 mm short each side and close the gap with ARC TCB Movement Clips (call to order).

What about acoustic performance?
ARC Party-Wall Socks deliver ≥67 dB DnT,w + Ctr when used with mineral-wool slab and 13 mm plasterboard both sides.

Delivery cut-off & surcharges?
Order by noon, hit £200 ex-VAT; see delivery information for Highlands & Islands.


Bundle for a fully compliant façade

Need CAD details, ψ-value data or toolbox-talk slides? Contact us or call 0118 922 7941—Spechunter will chase down every spec so you don’t have to.

Spechunter.co.uk – Chasing down specialist construction specifications since 1988.

...