ARC Party Wall Cavity Socks

Seal party-wall cavities in one push-fit move

ARC Party-Wall Cavity Socks are vertical fire, smoke and sound barriers that friction-fit the full height of a party wall. Made from Euroclass A1 rock-fibre wrapped in a red polythene sleeve, each 1.2 m length expands to close the void, delivering up to 4 hours fire integrity and 15 minutes insulation when tested to EN 1366-4 and certified under IFCC 1728. The mineral wool’s λ 0.037 W/m·K slashes cold bridging, helping you chase that elusive zero U-value at party-wall junctions. 

Order before 12:00 and spend £200 ex-VAT for free next-working-day delivery. Our technical desk (0118 922 7941) will size and schedule the socks straight from your drawings.


Pick the right sock in seconds

Clear cavityProduct link*Dimensions (mm)Pack qty
50 mmPWCSS 5055 × 250 × 120012
75 mmPWCSS 7580 × 250 × 120010
100 mmPWCSS 100105 × 250 × 12008
125 mmPWCSS 125130 × 250 × 12006
150 mmPWCSS 150155 × 250 × 12006

*Links take you straight to the individual bagged sizes on Spechunter.

Need a wider barrier? Step up to our ARC T-Barrier Masonry, available to 300 mm.


Three-step installation

  1. Measure & cut – trim socks with a sharp knife so all joints land tight to floor slabs or gable returns.

  2. Compress & insert – squeeze the mineral wool and push into the cavity until the sleeve sits flush with the brick face of the party wall.

  3. Seal junctions – butt successive pieces firmly; seal gaps > 5 mm with intumescent acrylic or mineral-wool offcuts.

That’s it—no mechanical fixings, ties or DPCs required.


Compliance snapshot

RequirementARC Party-Wall Sock performance
Fire safety (ADB & BS 9991)Up to 4 h fire integrity / 2 h insulation 
Acoustics (Part E)Mineral wool core damps flanking sound; supports +5 dB targets.
Thermal (SAP / Part L)λ 0.037 W/m·K; helps achieve zero U-value at party wall. 
Third-party certificationIFC Certificate IFCC 1728 – ongoing factory audits. 

Frequently asked questions

Do I need a separate DPC at the party-wall edge?

Where moisture ingress is a risk, use our ARC Party-Wall DPC Cavity Socks which add an integral DPC layer.

Can I use these in timber frame?

For timber-to-timber party walls switch to ARC TCB Timber Cavity Barriers—sized and tested for timber studs.

How high should I install the socks?

Fit a continuous line the full storey height at every compartment floor and roof junction; Building Control may also ask for intermediate breaks on walls taller than 10 m.

Are brackets needed?

No—friction alone secures the sock. Just keep the cavity width within the stated 5 mm tolerance.

Can I get proof for my fire strategy?

Absolutely—download the IFCC certification or request the full EN 1366-4 test report via Contact Us.


Complete your party-wall package


Order now for next-day UK delivery—or call 0118 922 7941 and let our 35-year building-envelope team chase down the spec for you.

Spechunter.co.uk – Chasing down specialist construction specifications since 1988. Fact Checked and updated May 2025.

...