- Home
- ARC Spandrel Barrier
ARC Spandrel Barrier
Stop fire racing up the gable … before the scaffold even comes down
Where a pitched roof meets an external wall, the cavity continues all the way to the verge unless you close it. ARC Spandrel Barriers push-fit into that awkward wedge, delivering a certified line of defence against fire, smoke and sound transfer in seconds.
Euroclass A1 mineral-wool core with white polythene sleeve – no added fire load, weather-safe on site.
60 minutes fire integrity & insulation to EN 1366-4, third-party approved (IFCC 1727).
Lambda 0.037 W/m·K: tackles the thermal bridge at the roof–wall junction, easing SAP calculations.
Works with masonry walls and panelised timber or light-steel spandrel panels.
No fixings – compression holds the barrier until the outer leaf is completed.
Need a drawing mark-up? Email plans to our tech desk or phone 0118 922 7941 – 35 years’ envelope know-how on tap.
Select the right barrier in seconds
| Clear cavity (mm) | Product link* | Dimensions (mm) | Pack |
|---|---|---|---|
| 100 | SPB100/100 | 100 × 100 × 1200 | 12 |
| 120 | SPB120/100 | 120 × 100 × 1200 | 12 |
| 140 | SPB140/100 | 140 × 100 × 1200 | 10 |
| 160 | SPB160/120 | 160 × 120 × 1200 | 8 |
| 180 | SPB180/120 | 180 × 120 × 1200 | 6 |
| 200 | SPB200/120 | 200 × 120 × 1200 | 6 |
*Click a code to jump straight to the bagged size on Spechunter.
Need >200 mm? Ask about made-to-order widths up to 300 mm.
How to install – three quick steps
Measure & cut – 1.2 m lengths trim with a hand saw; keep joints tight.
Compress & insert – push the barrier into the sloping cavity until the sleeve sits flush with the inner leaf. Maintain 5 mm compression.
Butt & seal – tight butted joints are fine; gaps > 5 mm get a mineral-wool off-cut or intumescent acrylic.
Pair with ARC Cavity Stop Socks at floor lines and ARC Party-Wall DPC Horizontal where separating walls meet the roof.
Compliance snapshot
| Requirement | ARC Spandrel Barrier performance |
|---|---|
| Approved Doc B / BS 9991 | ≥ 60 min fire integrity & insulation (IFCC 1727) |
| Approved Doc E | Mineral-wool core reduces flanking dB at roof junction |
| Approved Doc L | λ 0.037 W/m·K helps achieve low Ψ-value at eaves/verge |
| Environmental | A+ Green Guide rating; CFC/HCFC-free |
Frequently asked questions
Do I need mechanical fixings?
No – the wedge profile and compression fit hold the barrier until the wall is closed.
Is this product suitable for timber-frame spandrel panels?
Yes – simply fit the barrier tight to the panel edge before craning into place. For party-wall edges use ARC TCB Timber Barriers.
What about cavities over 200 mm?
ARC can manufacture special widths up to 300 mm – typical lead time five working days; contact us for a quote.
Can I get next-day delivery?
Order before noon, meet the £200 ex-VAT threshold and check our delivery information for remote-area surcharges.
Complete your roof-line specification
Party-wall stops – PW-TCB or PW-DPC Socks
Window reveal closers – Rockfibre Insulated DPC
Wide cavities – step up to ARC T-Barrier Masonry
Order today for free next-day UK delivery – and chase down every last spec with Spechunter.
Spechunter.co.uk – Chasing down specialist construction specifications since 1988. Fact checked & updated May 2025.
...






