ARC T-Barrier Masonry
One-piece protection at every party-wall edge
When a separating wall arrives at the outer leaf you need a barrier that blocks fire, smoke, flanking noise and heat loss—without holding up brickwork. The ARC T-Barrier Masonry (TBM) does exactly that:
Euroclass A1 mineral-wool core in a tough white polythene sleeve—weather-safe on site.
T-shape gives a 75–150 mm vertical leg inside the party cavity and a 100–150 mm horizontal flange into the external cavity.
Up to 4 hours fire integrity / 2 hours insulation (EN 1366-4, IFCC 1727).
λ 0.037 W/m·K plus 250 mm overlap meets the zero-U party-wall detail for SAP.
No mechanical fixings—compression holds the barrier until the outer leaf is closed.
Spend £200 ex-VAT and order before 12:00 for free next-working-day delivery. Tech questions? Ring 0118 922 7941.
Pick your T-Barrier in seconds
Party-wall leg × External flange (mm) | Product link | Pack qty* |
---|---|---|
75 × 100 | TBM75 100 | 6 |
75 × 120 | TBM75 120 | 6 |
75 × 125 | TBM75 125 | 6 |
75 × 150 | TBM75 150 | 3 |
100 × 120 | TBM100 120 | 4 |
100 × 125 | TBM100 125 | 4 |
100 × 150 | TBM100 150 | 3 |
125 × 100 | TBM125 100 | 6 |
125 × 120 | TBM125 120 | 6 |
125 × 125 | TBM125 125 | 4 |
125 × 150 | TBM125 150 | 3 |
150 × 100 | TBM150 100 | 6 |
150 × 120 | TBM150 120 | 6 |
150 × 125 | TBM150 125 | 6 |
150 × 150 | TBM150 150 | 3 |
*Pack quantities vary with width—see each product page for confirmation.
Need wider flanges (up to 300 mm)? Ask our team for specials.
How to install (3-step method)
Trim the 1200 mm length so joints land tight to slabs or gable returns.
Compress & push-fit—the vertical leg slides into the party cavity; the horizontal flange fills the external cavity to the outer leaf face. Maintain 5 mm compression.
Butt & seal—tight joints are fine; gaps > 5 mm get a mineral-wool off-cut or intumescent acrylic.
Pair with ARC Party-Wall Cavity Socks for vertical runs and ARC Spandrel Barriers at the roof line.
Compliance snapshot
Requirement | TBM performance |
---|---|
Approved Document B / BS 9991 | ≤ 4 h fire integrity, ≤ 2 h insulation (IFC 1727) |
Approved Document C | Polythene sleeve forms cavity moisture break |
SAP / Part L | λ 0.037 W/m·K; supports zero-U party-wall detail |
Approved Document E | Rock-fibre core reduces flanking sound ≥ 5 dB |
Frequently asked questions
Is mechanical fixing ever required?
No—the T-Barrier relies on friction. Keep cavity sizes within ±5 mm of the product to retain the compression.
Can I use TBM in timber-frame construction?
These SKUs are sized for masonry outer leaves. For timber-frame edges specify ARC TCB Timber Barriers.
What about floor junctions?
Use ARC Party-Wall DPC Horizontal or PW-TCB for timber builds.
Is next-day delivery guaranteed?
Order before noon, spend £200 ex-VAT and check our delivery information for remote-area surcharges.
Complete your junction strategy
Vertical fire stops – Cavity Stop Socks
Reveal closers – Rockfibre Insulated DPC
Spandrel / verge barriers – ARC Spandrel Barrier
Need spec sheets? Contact us or phone 0118 922 7941.